dcsimg
Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana
FAQ

Title

Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana : volume one, Libby Dam project -- operator, U.S. Army Corps of Engineers

By

Yde, Chris A., 1952-

Olsen, Arnold.
Montana. Department of Fish, Wildlife, and Parks
United States. Bonneville Power Administration. Division of Fish and Wildlife.

Type

Book

Material

Published material

Publication info

Portland, Ore. (P.O. Box 3621, Portland 97208), Bonneville Power Administration, Division of Fish and Wildlife, [1984]

Notes

"Final report 1984"--Cover.

Funded by Bonneville Power Administration, project no. 83-464."

"October 1984"--Cover.

At head of title: Final report.

Cover title: Wildlife impact assessment and mitigation summary: Montana hydroelectric projects, volume I -- Libby Dam.

Subjects

Environmental aspects , Hydroelectric power plants , Koocanusa, Lake (B.C. and Mont.) , Libby Dam (Mont.) , Wildlife management

Classification

639.92/09786/81

Language

English

Identifiers

DOI: https://doi.org/10.5962/bhl.title.45713
OCLC: 42994205

 

Find in a local library Download MODS