dcsimg
New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives
FAQ

Title

New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives Report 7 Settling and chemical clarification tests

Related Titles

Series: Technical report (U.S. Army Engineer Waterways Experiment Station), EL-88-15 Rept. 7

By

Wade, Roy.

Waterways Experiment Station (U.S.)
United States. Environmental Protection Agency. Region I.

Type

Book

Material

Published material

Publication info

Vicksburg, Miss, U.S. Army Engineer Waterways Experiment Station, 1988

Notes

Cover title.

"November 1988."

Report 7 of a Series.

Subjects

Dredging , Dredging spoil , Environmental aspects , Marine sediments , Massachusetts , New Bedford Harbor , Testing , Water pollution control industry

Call Number

TA7 .W34 no.EL-88-15 rept.7

Language

English

Identifiers

DOI: https://doi.org/10.5962/bhl.title.48350
OCLC: 18886137

 

Find in a local library Download MODS