dcsimg
San Isidro watershed rehabilitation plan
FAQ

Title

San Isidro watershed rehabilitation plan

Title Variants

Alternative: San Ysidro watershed rehabilitation plan

By

United States. Bureau of Land Management. Albuquerque District, , issuing body

Type

Book

Material

Published material

Publication info

Albuquerque, N.M, U.S. Department of the Interior, Bureau of Land Management, Albuquerque District Office, 1988

Edition

Revised edition

Notes

"Through inventory of watersheds and a priority rating system, the Rio Puerco Resources Area, Albuquerque District has chosen the San Isidro watershed for sediment control and gully rehabilitation work. Portions of this drainage are actively headcutting and contributing sediment to downstream reservoirs and farmland on the Rio Puerco and Rio Grande. A special emphasis in the San Isidro watersheds will be on the structural treatment of small continuous gullies. This dictates that most of the structural work will occur on the upper reaches of the watershed"--Page 5.

Contents: Description of soil and water condition -- Problem analysis -- Current resource management and existing data base -- Public interest -- Objectives -- Constraints -- Planned actions -- Environmental assessment -- Project design -- Plan implementation -- Appendices: Watershed project map , Rangeland investment analysis , Existing ground waters and surface waters.

Cover title.

"Prepared March 1985, revised January 1988."

Subjects

Bureau of Land Management , New Mexico , Rio Puerco Resource Area , San Ysidro (Sandoval County) , United States , Watershed management , Watershed restoration

Call Number

QH541.15.R45 S265 1988

Language

English

Identifiers

OCLC: 1249943281

 

Find in a local library Download MODS