Title
Wildlife impact assessment and summary of previous mitigation related to hydroelectric projects in Montana : volume one, Libby Dam project -- operator, U.S. Army Corps of Engineers
By
Yde, Chris A., 1952-
Olsen, Arnold.
Montana. Department of Fish, Wildlife, and Parks
United States. Bonneville Power Administration. Division of Fish and Wildlife.
Type
Book
Material
Published material
Publication info
Portland, Ore. (P.O. Box 3621, Portland 97208), Bonneville Power Administration, Division of Fish and Wildlife, [1984]
Notes
"Final report 1984"--Cover.
Funded by Bonneville Power Administration, project no. 83-464."
"October 1984"--Cover.
At head of title: Final report.
Cover title: Wildlife impact assessment and mitigation summary: Montana hydroelectric projects, volume I -- Libby Dam.
Subjects
Environmental aspects
,
Hydroelectric power plants
,
Koocanusa, Lake (B.C. and Mont.)
,
Libby Dam (Mont.)
,
Wildlife management
Classification
639.92/09786/81
Language
English
Identifiers
DOI:
https://doi.org/10.5962/bhl.title.45713
OCLC:
42994205
Find in a local library