dcsimg
Shinnecock Inlet, New York, site investigation
FAQ

Title

Shinnecock Inlet, New York, site investigation Report 2 Evaluation of sand bypass options

Title Variants

Alternative: Evaluation of sand bypass options, Shinnecock Inlet, New York

Related Titles

Series: Technical report (U.S. Army Engineer Waterways Experiment Station), CHL-98-32 rept.2

By

Williams, Gregory L.

Lillycrop, Linda S.
Morang, Andrew, 1953-
Coastal and Hydraulics Laboratory (U.S. Army Engineer Waterways Experiment Station)
Coastal Inlets Research Program (U.S.)
Waterways Experiment Station (U.S.)
United States. Army. Corps of Engineers.

Type

Book

Material

Published material

Publication info

Vicksburg, Miss, U.S. Army Engineer Waterways Experiment Station, 1998

Subjects

Coastal zone management , New York (State) , Sand bypassing , Shinnecock Inlet (N.Y.) , Shore protection

Call Number

TA7 .W34 no.CHL-98-32 rept.2

Language

English

Identifiers

DOI: https://doi.org/10.5962/bhl.title.48385
OCLC: 40548751

 

Find in a local library Download MODS